University :Mansoura University |
Faculty :Faculty of Engineering |
Department :Weaving and Textile |
|
| 1- 1- Course data :- |
| | Code: | 06411 | | Course title: | Industrial Orgamixation | | Year/Level: | Fourth | | Program Title: | | | Specialization: | | | Teaching Hours: | Theoretical: | 2 | Tutorial: | 4 | Practical: | |
|
| 2- 2- Course aims :- |
| - List and define knowing the requirements about organization, planing and control the production process in spinning mills
- Discuss and explain how to choose raw material ,mill site and production operations
- Construct and design a spinning mills for short and long staple spun yarn
- Estimate the productivity , number of machines, labour , floor space , power and lighting
|
| 3- 3- Course Learning Outcomes :- |
| |
| 4- 4- Course contents :- |
| | No | Topics | Week No. |
|---|
| 1 | Textile Mill planning and organization; Capital requirement, choice of suitable site, planning for mill building. | | | 2 | * Documentation relating to preparatory and spinning machinery: i) Choice of raw materials. ii) Spin plan, waste distribution, doubling, draft distribution and twist. iii) Production plan: machine productivity, machine specification, technology and technical data, layout of machinery. iv) Labor requirements, power consumption and floor space. | | | 3 | * Spinning mill project for producing: i) Ring spun yarns (Carded - Combed – cotton/ synthetic blend ) for all counts. ii) Open-end yarns (cotton, cotton waste blend, production of combed yarn). | | | 4 | * Calculation of production cost (Capital cost, operating cost, wage cost) | | | 5 | * Calculation of standard time for the operator, efficiency %, and spindle allocation. | |
|
|
| 5- 5- Teaching and learning methods :- |
| | S | Method |
|---|
| Lectures | | Tutorial | | Information collection from different sources | | Field visits |
|
|
| 6- 6- Teaching and learning methods of disables :- |
| - -
|
|
| 7- 7- Student assessment :- |
| - Timing |
| | No | Method | Week No. |
|---|
| 1 | | 3 times/ year | | 2 | | periodical / every week. | | 3 | | mid-term after 7 weeks. | | 4 | | at the end of the term. |
|
| - Degree |
| | No | Method | Degree |
|---|
| 1 | Mid_term examination | 10 | | 2 | Final_term examination | 70 | | 3 | Oral examination | 4 | | 4 | Practical examination | | | 5 | Semester work | 8 | | 6 | Other types of asessment | 8 | | Total | 100% |
|
|
| 8- 8- List of books and references |
| | S | Reference | Type |
|---|
| 1 | El-Bealy R.A. , " Spinning Mill Organization" | | | 2 | * Computer Service of manufacturing companies : - Sehlafhorst Documentation (Germany). - Rieter Documentation (Switzerland). - Zinser Documentation (Germany). - Howa Documentation (Japan). | |
|
|
| 9- 9- Matrix of knowledge and skills of the course |
| | S | Content | Study week |
|---|
| Textile Mill planning and organization; Capital requirement, choice of suitable site, planning for mill building. | | | * Documentation relating to preparatory and spinning machinery: i) Choice of raw materials. ii) Spin plan, waste distribution, doubling, draft distribution and twist. iii) Production plan: machine productivity, machine specification, technology and technical data, layout of machinery. iv) Labor requirements, power consumption and floor space. | | | * Spinning mill project for producing: i) Ring spun yarns (Carded - Combed – cotton/ synthetic blend ) for all counts. ii) Open-end yarns (cotton, cotton waste blend, production of combed yarn). | | | * Calculation of production cost (Capital cost, operating cost, wage cost) | | | * Calculation of standard time for the operator, efficiency %, and spindle allocation. | |
|
|
| Course Coordinator(s): - |
| - Rezk Abd Allah Mahmoud El Bialy
|
| Head of department: - |
| Fawkia Fahim Esmail El Habiby |